We're doing what others didn’t dare to.

CMS

We’re doing what others walked away from.
Instead of tearing it down, we’re bringing it back – smarter, greener, and bolder than ever.

V Tower, a 2000s office high-rise in Warsaw, is getting a second life and setting a whole new benchmark for modern, sustainable transformation.

From radical carbon savings to future-ready tech – this is one of the most ambitious office redevelopments in Poland.

Summary of the article:

- V Tower is the modernization of the former Warta Tower in Warsaw – the high-rise at Chmielna 85 is undergoing a complete transformation instead of demolition, making it a symbol of a more sustainable approach to architecture.

- V Tower will retain its original architectural form – the façade and shape remain unchanged, while the building’s interior will be entirely refreshed.

- The redevelopment includes a full upgrade of all systems and BMS infrastructure – including new ventilation, cooling, elevators, lighting, and intelligent energy management.

- After modernization, the tower will meet Class A standards – with BREEAM Excellent, WELL, and “Barrier-Free Building” certifications, as well as a 40% reduction in operational emissions.

🔗 Read more about how we’re reshaping the face of office real estate in Poland:

https://www.architekturaibiznes.pl/v-tower-modernizacja,40255.html

CMS

Transformation of a 2000s office tower into one of the most sustainable high-rises in the capital.

We’re doing what others walked away from.
Instead of tearing it down, we’re bringing it back – smarter, greener, and bolder than ever.

V Tower, a 2000s office high-rise in Warsaw, is getting a second life and setting a whole new benchmark for modern, sustainable transformation.

From radical carbon savings to future-ready tech – this is one of the most ambitious office redevelopments in Poland.

Summary of the article:

- V Tower is the modernization of the former Warta Tower in Warsaw – the high-rise at Chmielna 85 is undergoing a complete transformation instead of demolition, making it a symbol of a more sustainable approach to architecture.

- V Tower will retain its original architectural form – the façade and shape remain unchanged, while the building’s interior will be entirely refreshed.

- The redevelopment includes a full upgrade of all systems and BMS infrastructure – including new ventilation, cooling, elevators, lighting, and intelligent energy management.

- After modernization, the tower will meet Class A standards – with BREEAM Excellent, WELL, and “Barrier-Free Building” certifications, as well as a 40% reduction in operational emissions.

🔗 Read more about how we’re reshaping the face of office real estate in Poland:

https://www.architekturaibiznes.pl/v-tower-modernizacja,40255.html